Conservation of 10 The Terrace

This building had a serious rising damp problem to the ground floor.  Conservation work included the installation of drainage at the base of the external footings, the replacement of damaged plaster internally and repainting of the walls. An electronic moisture barrier system was also installed. During this project fireplaces were uncovered in three of the rooms and the stonework around these has been conserved.